A clearer picture of your ADU budget.

A square-foot price is only the beginning. Put the rest of the project in the same picture, before you compare quotes.

01 / Your assumptions

Build your project budget

Replace these illustrative starting values with estimates for your project. Keep construction separate from the other categories to avoid double counting.

02 / Illustrative example

All-in planning allowance

$318,550

600 sq ft · $531 per sq ft including all categories

Construction
$210,000
Design & engineering
$25,000
Permits & fees
$12,000
Site & utilities
$30,000
Contingency
$41,550

Contingency is 15% of all four base categories. This worksheet adds your assumptions; it does not predict a contractor’s price or confirm what fits on your lot.

Open my ADU plan ↗

Saving keeps this worksheet on this browser. Update the example before saving it to your plan.

How to use this ADU cost calculator

The starting values are an illustrative scenario created by Local ADU Guide, not a survey of local bids. Change each allowance to match written estimates. An included item belongs in one category only: if your construction proposal includes utility work, remove that amount from the separate site allowance.

For regional context, the San Mateo County ADU Resource Center gives a rough $450–$600 per square foot placeholder that includes hard construction costs and soft design/fee costs. That is not a construction-only input for this worksheet. Actual costs vary by scope and site. Source accessed September 7, 2026.

What to check before relying on the total

  • Ask whether demolition, excavation, foundation, utility trenching and electrical service upgrades are included.
  • Check allowances for structural engineering, surveys, soils work, agency fees and energy documentation.
  • Add any financing costs, taxes, insurance, landscaping or furnishings you need separately; this worksheet does not calculate them.
  • Use written contractor and agency estimates before making financial commitments. The entered size is a budget input, not a zoning approval.